Heading
Heading
Focus on construction — we'll handle the project
We design schools, clinics, sports and recreation centers, and other facilities. We manage the project from the initial site survey through to final drawings and cost estimates — all guaranteed to pass expert review.
Fair terms of cooperation:
- The price is fixed. No additional payments after the contract is signed.
- Deadlines are flexible only in your favor — we accelerate the timeline if you need us to.
Our top priority is for you to receive the completed documentation on time, with no unnecessary follow-up questions from the expert review board.
Services
-
Building Inspection
- We provide documented evidence of the actual condition — so expert reviewers have no questions about your cost justification.
- We identify which structures can stay and which must go — so you don’t pay for unnecessary demolition.
- We pinpoint which networks have failed and which still have service life — avoiding unjustified replacement costs.
- We create defect lists on-site — estimators get accurate volumes, not rough guesses.
-
Architectural and Urban Planning Concept (pre-design)
- We offer multiple concept options: form, scale, and style — aligned with your budget and schedule.
- We streamline city approvals: prepare documents in the required format and resolve comments proactively.
- We minimize rework risks in later stages by resolving key decisions upfront.
-
Design Documentation (Stage P)
- We design to pass expert review on the first attempt — we know the requirements of Glavgosexpertiza, Mosgosexpertiza, and other agencies.
- We tailor solutions to your budget and realistic lead times — accounting for equipment from Russia, China, Turkey, or other countries.
- We plan for operations before the management company comes in: convenient access points, loading zones, storage for residents and engineering services, separated traffic flows for residents, staff, visitors and guests, public spaces for seniors, and designated areas for smokers and non-smokers.
- During design, we collect input from the technical customer, management company, and future general contractor — and integrate everything to avoid problems during construction, handover, and operation.
-
Working Documentation (Stage R)
- We issue quantity takeoffs as a separate volume — your procurement team saves time instead of re-measuring drawings.
- We optimize solutions: cut costs without losing quality or safety. BIM models reveal savings in common areas and their finishes.
- We assist your procurement department with equipment suppliers through clear recommendations.
- We coordinate documentation with utility asset holders, so you face no unpleasant surprises at handover.
-
Cost Estimation Documentation
- We prepare estimates for your specific expert review (Glavgosexpertiza, Mosgosexpertiza, Mosoblexpertiza, or a departmental body) — so it’s accepted without rework or delays.
- We show, for your reference, which items and materials drive core margins — helping you (owner or general contractor) stay in the black.
- We prepare comparative estimates — just in case the general contractor’s plan goes off track.
- Total estimated cost remains at or above market level — you deliver the project without loss and avoid going negative.
-
Expert Review Support (State or Non-State)
- We handle all communication with reviewers: promptly make corrections and respond to comments.
- We shorten approval timelines — we know the requirements and hidden pitfalls of each authority.
- We eliminate rejections due to formal errors: check completeness, formatting, and code references.
- We remove you and your general contractor from the process as much as possible. We only bring you in for key decisions — you don’t need to sit through every comment.
-
Architectural Supervision during Construction
- We quickly approve changes caused by unforeseen site conditions — avoiding downtime.
- We reduce the construction team’s dependency on the original designer: architectural supervision acts as a safety net.
- We help coordinate any changes with the holders of main utility networks and facilities.
View cost
The cost calculation is for informational purposes only and does not constitute a public offer or commercial proposalProject area
Type of facility
-
Industrial facilitiesFactories, plants, depots, railway stations, Geographic Information System (GIS) The cost is based on 1 m2 of design for a simple cold storage warehouse without complex process solutions
-
OtherSports and recreation centers, swimming pools, sheds, data centers, ice arenas, stadiums, hotels, administrative and household buildings, theaters, preschools, schools, clinics, hospitals, hospices, laboratories The cost is based on the design of a simple building without complex process solutions.
-
Multi-residential buildings (only for S from 5,000 m2)Block of flats The cost is based on the design of a building with all standard floors, without a stylobate and complex basement floors
Project stages
- Estimate Documentation (ED)* * Cost is calculated individually
Our projects
-
-
Physical education and recreation complex
Oryol Chief Architect: Vdovin E.A. -
FIFA 2018 World Cup Stadium
Kaliningrad Chief Architect: Vdovin E.A. -
Retail and office complex
Lipetsk Chief Architect: Vdovin E.A. -
Retail and office complex
Tyumen Chief Architect: Vdovin E.A. -
Hotel complex with a recreation area on the site of the former "Plyos" holiday home
Plyos Chief Architect: Samsonov I.Y. -
Sales offices and management office for the "Novocheryomushkinskaya 17" residential complex
Moscow Chief Architect: Prusakov P.N. -
Tram depot "Nagatinskoye"
Moscow Chief Architect: Melnikova N.V. -
Metal warehouse building
Tula Chief Architect: Prusakov P.N.